Finishing; Crystal Ember Installation; Driftwood Log And Topaz Glass Chips Installation - Napoleon ALLURAVISION Serie Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WARNING
!
Power supply service must be completed prior to finishing to avoid reconstruction.
Heat vents and air openings cannot be covered in any circumstances.
6.1

crystal ember installation

The glass front must be removed and the appliance must be secured in its final location before the crystal embers
are installed.
Carefully place crystal embers into the bottom media tray as
A.
illustrated. Apply an even layer from side to side.
note:
For NEFL32/42/50/60/74/100CHD, place the small crystal embers into
the media tray applying an even layer from side to side, then randomly
place the big crystal embers on top of the small crystal embers.
6.2

driftwood log and topaz glass chips installation

The front glass must be removed and the appliance must be secured in its final location before the driftwood logs
and topaz glass chips are installed.
1. Carefully place driftwood logs on the media tray.
2. Carefully place topaz glass chips to fill in spaces in between the driftwood logs.
Recommended driftwood log placement for NEFL50CHD
Recommended driftwood log placement for NEFL60CHD

6.0 finishing

finishing
19
W415-2212 / 08.22.17
EN

Publicité

Chapitres

Table des Matières
loading

Table des Matières