Clean-Up After Installation - Kohler SOK K-1188 Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10. Complete the Finished Wall or Deck
NOTICE: Provide unrestricted service access to the pump, in-line heater, adjustable feet, and control box.
You must construct an access panel to provide sufficient clearance for servicing the pump, in-line heater,
and control box.
Protect the product surface. Cover the framing with water-resistant wall material.
Keep the entire overflow channel area exposed to allow access to the drain overflow, and to permit easy
cleaning of the overflow channel surfaces.
Seal the joints between the rim edge and the water-resistant wall or deck material with silicone sealant.
Tape and mud the water-resistant wall material.
Install the finished wall to the water-resistant wall material.
Seal the joints between the product rim and the finished wall material with silicone sealant.
11. Install the Faucet Trim
Install the faucet trim according to the instructions packed with the trim.

12. Clean-Up After Installation

When cleaning up after installation, do not use abrasive cleansers, as they may scratch and dull the bath
surface. Use warm water and a liquid detergent to clean the surface.
Remove stubborn stains, paint, or tar with turpentine or paint thinner. Do not allow cleaners containing
petroleum distillates to remain in contact with any bath surfaces for long periods of time. Remove
plaster by carefully scraping with a wood edge. Do not use metal scrapers, wire brushes, or other metal
tools. Use a powder-type detergent on a damp cloth to provide mild abrasive action to any residual
plaster.
Kohler Co.
a a
13
Wa
a
Wa
a
a
1005288-2-D

Publicité

Table des Matières
loading

Table des Matières