Broan E60000 Serie Guide Du Propriétaire page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8. HORIZONTAL DISCHARGE INSTALLATION
(INTERNAL BLOWER(S) HOOD ONLY)
All internal blower hoods are factory shipped with the blower(s) mounted for a vertical discharge configuration. For a horizontal discharge
configuration, disassemble the blower(s) from the inner top of the hood and mount it (them) to the inner back panel of the hood. The
procedure below applies for one or two blowers.
L
EFT SIDE MOUNTING
SCREWS LOCATION
Using a 5/16" socket, remove all blower mounting
screws from the inner top of the hood. Keep the
screws for further use.
R
IGHT SIDE
MOUNTING SCREWS
LOCATION
HD0282
HD0269
Slide the blower to disengage its flange from the retaining bracket.
HD0270
R
IGHT SIDE
MOUNTING SCREWS
LOCATION
L
EFT SIDE MOUNTING
Rotate the blower and engage its flange in the
SCREWS LOCATION
back wall retaining bracket.
Using a 5/16" socket and the screws previously
removed, secure the blower to the hood.
HD0289
HD0288
9

Publicité

Table des Matières
loading

Table des Matières