Télécharger Imprimer la page

Initial Start-Up; Setting Up And Switching On - Waeco AirCom Service 6300G Manuel D'utilisation

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53

12 Initial start-up

17
Container for fresh oil
18
Container for UV additive (500 ml)
19
Drained oil receptacle
20
Cover flap
21
Main switch
22
Fan
12 Initial start-up
This chapter describes the procedures you have to carry out before you can operate the A/C service unit.
12.1

Setting up and switching on

Note In order to achieve correct measurements, the A/C service unit must be placed on a level flat sur-
face during operation. Ignore any error codes which occur during commissioning
page 35) and skip by pressing ENTER.
1.
Wheel the A/C service unit to the workplace and lock the front wheels.
2.
Mount the service hoses.
3.
Set the length of the service hoses
4.
Connect the A/C service unit to the power supply.
To switch the A/C service unit on, set the main switch to I.
5.
The switch-on delay runs for 35 s and the housing is ventilated. The software version number then appears
in the display for several seconds:
Dometic Germany GmbH
ASC6400G
LE
SN000000
SW:
Software status
DB:
Database
SN:
Serial number
LF:
Language file
6.
Once the start-up procedure is complete, the A/C service unit requires the selection of the refrigerant
(Selecting the refrigerant
12.2
Selecting the refrigerant
On initial start-up the A/C service unit displays the refrigerant selection menu.
1.
In the refrigerant selection menu use the cursor keys
ing example R153A).
Refrigerant
R-134a
R-1234yf
R-513A
8
(Setting the length of the service hoses
SW
LE640004
DB
mgas2107
LF
mgas0081
on page 8).
on page 10).
or
to select the desired refrigerant (in the follow-
(Troubleshooting
on

Publicité

loading

Ce manuel est également adapté pour:

Aircom service 6400g