3.2 Outer frame assembly
1. Remove the outer side rail (right) from the lower packing, the table top
assembly from the middle packing and the outer side rail (left) from the top
packing (see Figure 7).
2. Fix them using four M8×40 screws with the hex key provided.
3. Remove the outer table supporting rail (upper front) from the lower packing
and fix it with four M8 x 40 screws.
4. Remove the outer table supporting rail (lower) from the top packing and fix it
with two M8 x 40 screws. You can open the 2 side frames a little in order to
put the rails inside the frames and then
5. tighten the 10 screws as Figure 8 shows.
6. Make sure the 2 sides are all parallel after the screws are tight. You can see
the assembled view in Figure 9
1x outer side rail
(righthand)
Lower packing
8
1x working surface
Middle packing
Figure 7
Outer frame packing
1x outer side rail
1 x
(lefthand)
crossbatten
outer frame
(below)
1 x crossbatten outer frame
YPS-03-IA-e-1910
(front top)
Top packing