Minimum Framing Dimensions - Napoleon Ascent 36-1 Manuel D'installation Et D'opération

Modèles de gaz naturel et de propane
Masquer les pouces Voir aussi pour Ascent 36-1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.1

minimum framing dimensions

HORIZONTAL VENT SECTIONS: A minimum of 1" (25mm) at the bottom and sides, and 3" (76.2mm) at the top
of the vent pipe on all horizontal runs to combustibles is required.
note:
The minimum clearances from the top of the horizontal vent pipe to combustible materials may be reduced from
3" (76.2mm) to 1" (25mm) in those installations with a minimum 38" (96.5cm) vertical vent rise made immediately
off the appliance collar.
VERTICAL VENT SECTIONS: A minimum of 1" (25mm) all around the vent pipe on all vertical runs to
combustibles is required except for clearances in appliance enclosures. Vertical runs within the enclosure must
maintain a 3" (76.2mm) clearance from combustibles. See "minimum enclosure clearances" section.
side wall
35 1/2"
(90.2cm)
16"
(40.6cm)
2"
(51mm)
Do not put objects in front of the appliance
(minimum distance of 4 feet)
rough framing
33 7/8"
(86cm)
W415-2835 / A / 12.09.20
EN
27

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

B36ntr-1B36ntre-1B36ptr-1B36ptre-1

Table des Matières