SPEEDY 3 EXPORT
Quarterly verification
Since the scope of this verification in the case of mobile scaffolding is comparable to that of the daily
verification, a verification carried out at least once every 3 months is recorded in the establishment's safety
register.
NB: These verifications may only be carried out by members of staff in possession of a certificate of
competency issued by the head of the establishment with the reference "Verifier and User".
Verification sheet available from our Website:
http://tubesca-comabi.com/wp-content/uploads/2013/12/Conformite_Echafaudage_roulant.pdf
Chapter 6:
• Prior to dismantling:
- Ensure that the scaffolding is stable:
- Brake wheels blocked.
- Stabilisers correctly positioned, etc.
- Use ropes to handle elements if necessary.
• Prior to handling:
- Replace the pins and stoppers on the elements concerned.
- Isolate the damaged components to be replaced.
• During dismantling:
Follow the assembly procedure in the reverse order.
6-2 Dismantling
Page 19 of21