TUBESCA-COMABI SPEEDY 3 EXPORT Manuel De Montage Et D'utilisation page 39

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
SPEEDY 3 EXPORT
Chapter 6:
6-1 Verification, maintenance
VERIFICATION:
Inspect the parts prior to each assembly paying particular attention to:
- The wheel brakes.
- The safety equipment (pin, sleeve, lock, etc.).
- The hooks on the work base and their attachments.
- The plywood work bases.
- The stabiliser pipe clamps
All parts which show signs of:
- Permanent deformation.
- Drill holes.
- Notches (caused by grinding for example).
- Significant oxidation.
... must be discarded!
In case of doubt, replace the component.
MAINTENANCE
Keep parts clean and safety equipment in good working order.
Replace or clean all plates or stickers providing instructions for use and safety information.
Verification:
The statutory verifications (provided for in the order of 21 December 2004) are broken down as follows:
Verification prior to the service launch on each installation site:
- prior to initial use,
- in the event of dismantling following by reassembly of the scaffolding,
- following a change to the usage, atmospheric or environmental conditions which could affect safety when
using the scaffolding,
- following an interruption in usage for at least one month.
This verification includes an examination of suitability, assembly and installation and an examination of the
general condition of the facilities. The traceability of this verification will be recorded in the
establishment's safety register.
Daily verification
This consists of examining the general condition of the facilities.
The traceability of this verification is recorded in a sheet provided on the access hatch.
Page 18 of21

Publicité

Table des Matières
loading

Produits Connexes pour TUBESCA-COMABI SPEEDY 3 EXPORT

Table des Matières