SPEEDY 3 EXPORT
Chapter 1:
• The scaffolding must be assembled according to this assembly and operating manual.
• It is important to ensure that all the necessary pins and hooks are correctly positioned.
• The SPEEDY 3 must only be assembled and dismantled by staff who have been trained to follow
the assembly and operating instructions.
• Damaged elements and alternative brands must not be used.
• Reference should be made to the diagrams presented earlier in chap. 1-3 (p4) for the assembly of
elements.
• PPE (Personal Protection Equipment) must be worn when assembling and dismantling
scaffolding.
• Elements required for raising the product higher are hoisted on the guardrail side, once this
element has been put in place.
• Tools or other elements needed for working on the unit must be hoisted via the trapdoors on the
platforms
SPEEDY 3 EXPORT 5m
Max. platform height = 5.1m
1-5 Assembly and operating precautions
Rung n°
Page 6 of21