SPEEDY 3 EXPORT
Chapter 4:
4-2 Relocation instructions
• Mobile scaffolding must only be moved manually
on a sold, level floor without any obstacles on the ground or in the air.
Normal walking speed must not be exceeded
during relocation.
• Mobile scaffolding must be moved on a floor with a maximum gradient of 1%.
• Mobile scaffolding must never be towed by a motor vehicle.
• Mobile scaffolding must never be moved in the presence of wind speeds in excess of 35 km/h.
• The stabilisers must remain attached to the mobile scaffolding during relocation
(minimum play between the supporting plate and the floor).
• The floor on which the mobile scaffolding is moved must be capable of bearing
lowered loads.
• A bearing race must be provided on soft terrain.
• Mobile scaffolding must not be moved if staff
or equipment are still present.
• The scaffolding must not be lifted using the main crane or an overhead crane.
• The scaffolding should be "pushed" rather than "pulled"
Chapter 5:
Assembly for transport and doorways
The SPEEDY 3 can fit through doors with a width of 0.8m and a clear headroom of 1.9m.
Equipment and small tools may also be transported.
door width
Page 17 of21