Amana MVH250E Manuel De L'utilisateur page 42

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
STEP 4: PREPARE THE WALL AND UPPER CABINET FOR INSTALLATION
BE VERY CAREFUL WHEN DRILLING HOLES INTO THE WALL.
DRILL THE HOLES IN THE WALL AND UPPER CABINET.
1. Find the points on the wall template labeled D, E, F, and G. Drill a 3/16" diameter hole at any points that are
over a wall stud. Drill a 3/4" diameter hole at any points over drywall.
2. Locate the wall stud closest to the center of the areas marked H and I on the wall template. Drill 3/16" holes into
the wall stud in each of the areas. If a wall stud is not located within these areas, drill 3/4" diameter holes
nearest to the center of the areas as possible.
If there is not a wall stud within the areas marked H and I, or behind points marked D, E, F, and G, DO
NOT install microwave oven. (Consult building inspector.) There must be at least one stud in those areas.
3. Drill a 3/8" hole at points J, K, and N on the upper cabinet template.
NOTE: If the bottom of the upper cabinet is recessed 3/4" or more, you will need 2"x2" filler blocks (not included)
to provide additional support for the bolts. See Figure 23.
¥ Mark the center of each filler block and drill a 3/8" diameter hole at the marks.
¥ Align filler blocks over the two openings in the top of the microwave oven cabinet and attach to cabinet
with masking tape. See Figure 24.
4. Cut or drill a 2" diameter hole at the area marked M.
Power supply cord hole on the upper cabinet template. If the
upper cabinet is metal, you will need to cover the edge of the
hole with the power supply cord bushing (supplied) to prevent
damage to the cord from the rough metal edge.
YOU MUST COVER THE EDGE OF THE POWER
SUPPLY CORD HOLE IN A METAL CABINET WITH THE
POWER SUPPLY CORD BUSHING. FAILURE TO DO SO
COULD RESULT IN DAMAGE TO THE CORD AND
ELECTRIC SHOCK.
5. Cut out the venting areas (with the saber saw):
¥ Roof-Vented: cut out the shaded area marked L on the upper
cabinet template.
¥ Wall-Vented: cut out the shaded area marked O on the wall
template.
¥ Room-Vented: go to STEP 5, INSTALLING THE MOUNTING
PLATE, located on next page.
6. Complete whichever venting system you have chosen.
Use caulking compound to seal the exterior wall or roof opening
around the wall cap or roof cap.
Electrical wires could be concealed behind the wall covering
and if the drill hits them you could get an electric shock.
WARNING
WARNING
cabinet front
- 42 -
filler block
cabinet
bottom shelf
Figure 23
Figure 24
filler
block

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Mvh250wMvh250l

Table des Matières