Dimension Drawings - Gurari GCH B 051 Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Parts of the hood
The extractor hood consists of the following parts
1. Hood body
2. Exhaust outlet
3. Energy cable with plug
4. Controls

Dimension Drawings

Assembly
1. examination
Before starting the actual installation, the device should be checked. In addition to the control of
externally recognizable damage, a function check has to be done. Take out the device from the
packing, get rid of all packing materials and put the device with the back on the floor / table. After
connecting to a power supply, the lighting as well as the function of each stage should be checked.
Please take care that exhaust outlet is open through check.
2. Preparation
The hood must be installed in a cabinet. It is recommended that the cabinet is taken off the wall for
easier installation and to ensure easier accessibility. In the cabinet floor an opening corresponding to
5. Outer frame
6. Aluminium Fettfilter
7. Light LED
Clamping device
8.

Publicité

Table des Matières
loading

Table des Matières