STEP 14
A. Attach the end of 4110 MM lower cable (40#) through the opening of the leg developer,Place 1 pc pulley onto the cable,
Secure it with 1PC M10X60 Allen bolt (102#),2pcs bushing (42#) and 1pc M10 Aircraft nut (103#).
B. Draw the cable backwards,place 1pc pulley onto the cable, secure it with 1PC M10X65 Allen bolt (93#),2pcs bushing (41#)
and 1pc M10 Aircraft nut (103#).
C.Draw the cable backwards, place 1 pc pulley onto the cable, Secure the pulley with 1PC M10X45 Allen bolt (94#),2pcs Ø10
washer (105#) and 1pc M10 Aircraft nut (103#).
D. Draw the cable around the pulley and upwards,Place 1 pc pulley onto the cable,Secure it with 1pc M10*50 Alllen bolt
(95#),2pcs Ø10 washer (105#) ,2pcs bushing (44#),2pcs cable retainer (43#) and 1 pc M10*65 Aircraft nut (93#).
E. Draw the cable around the pulley and downwards,Place 1 pc pulley onto the cable,Secure it with the same way in C.
F. Draw the cable around the pulley and upwards,Place 1 pc pulley below the cable,Secure it with the double floating pulley bracket
with the same way in STEP 14 E.
G. Draw the cable around the pulley and downwards, place 1pc pulley onto the cable,Secure it with 1 pc M10*45 Allen bolt
(94#),2pcs Ø10 washer (105#) and 1pc M10 Aircraft nut (103#).
H. Draw the cable around the pulley and upwards and reach the opening of the front vertical frame,Place 1 pc pulley below the
cable and secure it with the same way in B.
103
103
105
105
105
105
102
105
103
103
95
105
105
105
4110
48