Boiler Start-Up, Operation And Stopping, Including Emergency Stop; Installation Restrictions - Kostrzewa Mini Bio Luxury Notice Technique

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 143

9. Boiler start-up, operation and stopping, including emergency stop

9. Boiler start-up, operation and stopping,
including emergency stop
9.1 Boiler inspection
Check the following before filling the boiler with water:
boiler internal checks - clean and check the internal insulation (fire
bricks)
check movable parts, especially pressurised
check valves, especially the safety valve
check controls, gauges, regulators (e.g. boiler control system)
boiler external checks - external insulation, boiler casing etc.
check connected systems
Remove any defects and faults in the boiler operation. Perform a water test after
major repairs and replacement of pressurised parts and long downtime periods.
9.2 Boiler and system filling
System and boiler feed water must meet the design requirements, see section
'Water quality requirements' . The difference between the feed water tempera-
ture and the boiler shell temperature (ambient temperature) must be as low
as possible – a threshold difference of 30°C is recommended. If this condition
cannot be met, extend the boiler filling time.
Filling procedure:
open feed valve
open return valve
open filling valve
check boiler and system condition and pressure device integrity
9.3 Start-up preparation
Check the following before boiler start-up:
check if all the safety and fire regulations and guidelines in the quick
guide to the safety and fire regulations for fuel systems and all compo-
nents including ducts, valves, controls, pumps etc. regarding gas tightness
are followed
check system pressure - if the system pressure is too low, increase the
pressure (with a low flow rate to reduce the volume of air introduced to
the system)
check fuel level in the storage hopper (refill if necessary to allow installa-
tion of the storage hopper cover)
check fuel level - check if the storage hopper is free from foreign material
(stones, steel parts etc.) which may affect fuel conveying, burner opera-
tion or cause damage to feeder components
check flue system - check if all fire regulations are followed
check wiring system
check auxiliary equipment (e.g. swirl vanes, if installed)
check boiler room ventilation system
check boiler condition (closed door side, cleanouts, pipe stoppers, etc. and
gas tightness)
Leader in pellet boilers
9.4 Boiler start-up
The boiler (system) must be started by an authorized installer (valid authorized
service technician, a certificate issued by Kostrzewa is required - source: www.
kostrzewa.com.pl 'Service' tab). Installation and trial run must be recorded
in the Warranty Card. The user must notify the relevant authorities of a new
boiler installation. The relevant authorities will inform the user on any further
procedures required (e.g. scheduled inspections, cleaning).
Start-up procedure:
check system pressure
open flue gas valve or throttle (if installed)
check fuel level in the storage hopper (refill as required)
check fuel condition and quality (fuel must not contain foreign material to
avoid damage to the boiler and its accessories)
make sure the grate type in the burner is compatible with the fuel used
connect the power supply, set boiler control system in service mode
feed fuel from the storage hopper until it flows through the flexible duct
press the main switch to activate the boiler control system - the control
system operates in automatic mode
when starting from cold (also restarting after maintenance and cleaning),
close the heat transfer to the heating equipment to reach the dew point
faster (see boiler control system User Manual)
at operating temperature connect the heating equipment in sequence
visually check the system after a few days of operation (door and access
door, flue gas tightness)
check boiler room ventilation
check room lighting (sufficient for operation and maintenance)
check access to places which require periodical maintenance (cleanout,
control, storage hopper, and burner)
check leak tightness of hydraulic connection between the boiler and the
central heating system
check gas tightness between the boiler and the flue
check if the electrical cables were not damaged in transit and if they are
properly connected to the device

9.4.1 Installation restrictions

Do not start the boiler, if one of the following applies:
no commissioning of the boiler by the relevant authorities has been
conducted (if required)
incorrect boiler or fuel feed system operation
flue ducts not vented
no water in the boiler
faulty safety valve operation
flue ducts not tight
boiler insulation damaged
safety devices and gauges performance issues
auxiliary equipment performance issues
fire hazard near the boiler.
Mini Bio Luxury 12; 21kW User Manual – EN 10.17
65

Publicité

Table des Matières
loading

Table des Matières