Mounting The Paint Hopper; Operation; Priming The Pump; Pressure Relief Procedure - Titan ED655 Mode D'emploi

Masquer les pouces Voir aussi pour ED655:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
Setup
3.5

Mounting the Paint Hopper

the return tube on a hopper unit.
1. Align the bottom of the paint hopper with the threaded inlet
valve on the paint pump block.
2. Turn the paint hopper clockwise to thread it onto the inlet
valve. Continue to turn the paint hopper until it is secure on
the inlet valve.
Make sure the threads are straight and the hopper
i
turns freely on the inlet valve. Do not cross-thread.
3. Place the ilter screen into the bottom of the paint hopper and
snap it in position.
pump.
i
Do not over-tighten. Hand-tighten only. Some
threads will be visible even when fully tightened.
1
2
6. Place the straight end of the return tube into the return tube
itting.
7. Thread the nut on the return tube onto the return tube itting
and tighten until the return tube is secure.
2
GB
4.
4.1
2. Remove the paint hopper cover and ill the paint hopper with
5. Turn the pressure control knob clockwise to between half and
Attention
Attention
4.2
1
1. Turn the pressure control knob counterclockwise to its lowest
3. Trigger the gun to remove any pressure that may still be in the
4. Lock the trigger by rotating the trigger lock forward until it
6

Operation

This equipment produces a fluid stream at extremely
high pressure. Read and understand the warnings
in the Safety Precautions section at the front of this
manual before operating this equipment.

Priming the Pump

counterclockwise to its lowest pressure setting.
material or place the suction set into a bucket of material.
2
1
full pressure. Let the unit prime 1 to 2 minutes after material
begins to low through the return tube.
Always reduce the pressure to zero before changing
the position of the PRIME/SPRAY valve. Failure to do
so may cause damage to the paint pump diaphragm.
If the pressure control knob is reduced to zero and
the PRIME/SPRAY valve is still on SPRAY while the
sprayer is operating, there will be high pressure in
the hose and spray gun until the PRIME/SPRAY valve
is turned to PRIME or until the spray gun is triggered
to relieve the pressure.

Pressure Relief Procedure

Be sure to follow the Pressure Relief Procedure when
shutting the unit down for any purpose, including
servicing or adjusting any part of the spray system,
changing or cleaning spray nozzles, or preparing for
cleanup.
setting.
hose.
stops.
POSSIBLE INJECTION HAZARD. Do not spray
without the tip guard in place. Never trigger the
gun unless the tip is in either the spray or the unclog
position. Always engage the gun trigger lock before
removing, replacing or cleaning tip.
Operation
ED655

Publicité

Table des Matières
loading

Table des Matières