English – Anglais - Englisch
-
Collecting basin: There are two possibilities
Collecting basin: There are two possibilities
for EWB series: collecting basin in concrete,
series: collecting basin in concrete,
or in FGRP.
For the first option, EWK will provide the
For the first option, EWK will provide
drawings to the client but in any case
construction of this casing will be EWK's
responsibility.
FGRP collecting basin is recommended for
FGRP collecting basin is recommended for
the installation of cooling tower in places
the installation of cooling tower in places
where civil works can't be done or when the
where civil works can't be done or when the
water outlet wants to be made by the lower
wants to be made by the lower
part.
Englisch
but in any case the
will be EWK's
Français– French
French - Französisch
- Bassin ramasseur d'eau: Il y a deux
Bassin ramasseur d'eau: Il y a deux choix
pour la série EWB: bassin ramasseur en
bêton ou bassin in PRFV.
bêton ou bassin in PRFV.
Dans le premier cas, EWK fournira les
Dans le premier cas, EWK fournira les
dessins au client mais la construction du
dessins au client mais la construction du
bassin ne sera pas sa responsabilité.
bassin ne sera pas sa responsabilité.
Le bassin en PRFV est
en PRFV est recommandé pour
l'installation des tours dans des sites où on
l'installation des tours dans des sites où on
ne peut pas faire des travaux civils ou bien
ne peut pas faire des trav
on veut faire la sortie d'eau pour la partie
on veut faire la sortie d'eau pour la partie
inferieure.
: bassin ramasseur en
Pag./Seite 10