Servicing
9 Servicing
9 .1 Important notes
Regular servicing is essential in order to ensure that the
device remains in safe working order, à „Maintenance
schedule" on page 26.
CAUTION
Crush hazard when jaws close.
f Do not insert fingers between top and bottom jaws and
do not keep your finger on the trigger.
f Always keep the power pack CPK switched OFF while
servicing is in progress.
CAUTION
Crush hazard due to moving/rotating parts when service
covers are open.
f Do not insert fingers underneath the drum and do not
keep your finger on the trigger.
f Always keep the power pack CPK switched OFF while
servicing is in progress.
9 .2 Spare parts and accessories
9 .2 .1 Spare parts
Spare parts and accessories can be ordered directly from
your national HellermannTyton representative,
à separate spare parts list.
Name
Power pack CPK
Power pack CPK with control box
Tie advancer
Case for AT2000 CPK
USB cable A/B, 1 .8 m
Connecting cable, 2 m
Connecting cable, 5 m
Power-supply cable
Operating Instructions for AT2000 CPK
Spare parts list for AT2000 CPK
Safety warnings
9 .4 Maintenance schedule
WHEN?
Monthly
Monthly
Approx. every 50,000 bindings
Approx. every 300,000
bindings
Annually or after approx.
1 million bindings
26
Article number
106-00100
106-00110
120-05400
106-00070
123-90028
120-29010
120-29011
120-29005
106-29004
106-29006
106-29003
WHO?
Operator
Operator
Setup specialist
Setup specialist
Setup specialist
9 .2 .2 Accessories
HellermannTyton offers the following accessories for the
AT2000 CPK; these accessories can be ordered at any
time as need arises:
Name
Bench mount kit CPK
Overhead suspension CPK
Suspension bow CPK
Balancer
Foot-operated switch
9 .3 Servicing by manufacturer
It is advisable to have the AT2000 CPK serviced by
HellermannTyton once a year or after every approx.
1 million bindings. This will allow the AT2000 CPK to be
checked and updated to the latest modification status.
Service contact addresses for all countries are posted on
the website:
www.HellermannTyton.com
WHAT AND HOW?
f Check the top jaw, à „Maintenance jobs" on page 27.
f Check the tie advancer, à „Export process data via power
pack CPK" on page 21.
f Check the end cap and, if necessary, change the cutter,
à „Check end cap" on page 27.
f Change the tie advancer, à „Export process data via power
pack CPK" on page 21.
f Change the top jaw, à „Maintenance jobs" on page 27.
AT2000 CPK• Operating Instructions • 04-2015 • 106-29004
Article number
106-00040
106-00050
106-00071
123-90012
120-00065