Installation Checklist - red lion RJS-PREM Série Manuel Du Propriétaire

Masquer les pouces Voir aussi pour RJS-PREM Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION CHECKLIST

This checklist has been provided for your convenience. If a step was missed, ensure power has been shut off at the breaker
and completely relieve pressure from the water system before continuing to work on the system.
s
WARNING
!
75 PSI PRESSURE RELIEF VALVE RECOMMENDED
This pump is capable of producing high pressure. Installing a 75 psi pressure relief valve is highly recommended.
Model #: ________________
Serial #: _________________
Date purchased: ____________
Location purchased: ________________________________________________
KEEP THIS MANUAL ACCESSIBLE FOR FUTURE REFERENCE.
Description
Voltage setting on pump verified and set to match voltage on the circuit breaker
Foot valve (for drilled wells) or check valve (for driven wells) installed
Wiring and electrical connected by licensed electrician
Pump intake connected to piping in well
Well seal in place
Pump discharge connected to tank and service line
Tank pressure checked and charged to 28 psi
All joints sealed with PVC cement, PTFE tape or heat and clamps
All connections checked for leaks
Pressure relief valve installed
All other accessories installed: drain cock, shut-off valve, pressure gauge (optional)
Breaker turned on
Pump primed
Model number and serial number recorded in this manual
Receipt stapled to manual
3

Publicité

Table des Matières
loading

Table des Matières