Télécharger Imprimer la page

ST Quadrat LUX-top ASP Série Manuel De Montage page 2

Masquer les pouces Voir aussi pour LUX-top ASP Série:

Publicité

Les langues disponibles

Les langues disponibles

®
LUX-top
ASP
EV 7
(8-hole)
Screwing onto wooden beam
Anchor point
for the attachment of PPE against falls from height
Installation Instructions (GB)
10/2017
ST QUADRAT Fall Protection S.A. – your competent partner for fall protection systems – www.lux-top-absturzsicherungen.de
g
Foreword
Before installing the anchor construction the load-bearing
capacity of the roofstructure must be ascertained.
Technical building regulations must be observed. Only original
parts of the anchor point system must be used.
Minimum Requirements/ Conditions of Assembly
Tabel 1
Rod-Ø ASP [mm]
Minimum wood strength class C24
Minimum screwing-in depth into wooden
beam [mm]
Minimum beam cross-section with roof
boarding made of planks or plywood with a
min. thickness according to tabel 2 [mm]
Minimum beam cross-section with roof
boarding made of OSB with a min. thick-
ness according to tabel 2 [mm]
Minimum beam cross-section without roof
boarding but with sufficient lateral distri-
bution (e.g. roof lathing) [mm]
Tabel 2
Type of roof boarding
Min. thickness
Min. width of the roof boarding
roof boarding made of
20 mm
Min. 80 mm per plank
planks (solid wood)
Min. 1500 mm overall
OSB-3
22 mm
Min. 625 mm per board
Min. 1250 mm overall
plywood
15 mm
Min. 1250 mm per board and
overall
Information for Germany:
Roof boarding according to table 2 is absolutely necessary!
The anchor eyebolt must be secured against untwisting after completion of the
construction work by tightening it against the counter nut until the safety wash-
er lies flat! Please make sure that the external thread of the rod is flush with the
anchor
eyebolt.
An
installation
documentation
(www.quick-doku.eu)!
ST QUADRAT Fall Protection S.A. – your competent partner for fall protection systems – www.lux-top-absturzsicherungen.de
Installation Position
18
26
C24
C24
80
80
60/140
60/140
60/140
100/140
Installation arrangement
80/140
80/140
Installation can take place on horizontal and sloped surfaces.
Installation process:
Positioning on the roof according to national rules and depend-
ing on the dimension of the building.
1. Align the baseplate of the anchor point centric above the
wooden beam / rafter.
2. Screw all 8 supplied wood construction screws (8 x 120
mm) perpendicularly and without pre-drilling through the
roof boarding into the wooden beam, using the holes in the
baseplate.
* IF THE REQUIRED MINIMUM SCREWING-IN DEPTH IS NOT
ENSURED DUE TO THE ROOF CONSTRUCTION FOUND ON
SITE, LONGER WOODSCREWS MUST BE REQUESTED FROM
has
to
be
made
THE MANUFACTURER!
ST QUADRAT Fall Protection S.A. – your competent partner for fall protection systems – www.lux-top-absturzsicherungen.de
*

Publicité

loading

Ce manuel est également adapté pour:

Lux-top asp ev 7