4
Installation
4 .1
Introduction
n
ote
The areas in which the electric motor(s)
of the bow thruster(s) and the batter-
ies are positioned must be dry and well
ventilated.
For overall dimensions see drawing, page
141.
The bow thruster is supplied in parts as
shown.
4 .2
Installation tailpiece and intermediate flange
• Ensure that the plastic shim plate (1) has been positioned on the
tail piece.
• Place one packing (2) between the tail piece and the tunnel.
• Apply a sealant (e.g. polyurethane or silicone) between the tail
piece and packing, and between the packing and the tunnel wall.
• Place the tail piece in the hole in the tunnel.
Any extra packings used should be ones capable of justifying the
tail piece.
*) e.g. Sikaflex®-292.
• Grease the hole of the intermediate flange and position this
flange.
• Check dimension 'H'; it must be between 32 and 35 mm (between
1
1
/
" and 1
3
/
").
4
8
• If the dimension 'H' is less than 32 mm (1
gasket between the thrust tunnel and the intermediate flange.
• Check again dimension 'H' .
• Now fit the intermediate flange permanently to the tail piece and
grease the threads of the bolts with 'outboard gear grease' *) be-
fore inserting and tightening them.
Check for possible leaks immediately the ship returns to wa-
ter .
*) A suitable grease is VETUS 'Shipping Grease' , Art. code: VSG.
vetus® Installation instructions BOW PRO Series Thruster: BOWB150 - BOWB180 - BOWB210
ø 250 mm
1
/
"), fit an additional
4
n
ote
2
1
H = 32 - 35 mm
(1
1
/
"- 1
3
/
")
4
8
Outboard Gear
Grease
ENGLISH
H < 32 mm
(< 1
1
/
")
4
M12
19
30 - 35 Nm
(22 - 26 ft.lbf )
020809.04
25