Supply Voltage; External Bar Operating Ok Signaling - ITW SIMCO ThunderION Notice D'utilisation

La barre permet de neutraliser la charge électrostatique des feuilles, bandes et autres matériaux plats
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.4.2. Supply voltage

 Ensure that the supplymains voltage is correct.
For wiring up to and including 20 m in length (AWG20):
 Connect the connector to the bar according to one of the diagrams, see Appendix 1.
Without remote On/Off
Position two jumpers on the connector and
connect the supply voltage here:
Pins 1 and 2 (+24 V)
Pins 5 and 6 (0 V)
For wiring with a length between 20 and 40 m (AWG20):
 See appendix 2

4.4.3. External Bar operating OK signaling

It is possible to check the bar's functioning remotely with a PLC, for instance. For this purpose,
an optocoupler output is available on the connector (max. load 30 V DC, 50 mA).
Connect the external signaling to pins 3 and 4 of the connector according to the diagram
(Bar operating OK: see Appendix 1).
ThunderION_UM_9752160010_NL_D_GB_F_V2_2
With remote On/Off
Connect the supply voltage to pin 1 (24 V)
and pin 6 (0 V)
Connect the control voltage to:
Pin 2 (+24 V DC) and pin 5 (0 V)
34

Publicité

Table des Matières
loading

Table des Matières