dirna Bergstrom bycool blue line FLAT ADR Instructions De Montage page 23

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

FLAT
Place (1) M6 nut on each stud bolt do not
8a
tighten.
Attach the ducts to the interior air distribution
8b
panel using LOCTITE Superglue 3 or similar,
in order to facilitate the assembly of the
equipment and ensure the flows of cold air
through the louvres.
Connect the (2) 4-way boxes and (1) 2-way
8c
box of the interior air distribution panel to
those of the Bycool.
8a
8b
Area where
adhesive is
applied
4 way
23
EN
ES
®
8a
8c
2 way

Publicité

Table des Matières
loading

Table des Matières