Electrical Connection; Preliminary Checks - Gemm NEW RUNNER Série Mode D'emploi

Masquer les pouces Voir aussi pour NEW RUNNER Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 – SETTING UP
AFTER INSTALLING THE APPLIANCE, WAIT AT LEAST TWO HOURS BEFORE TURNING IT ON.
AFTER INSTALLING THE APPLIANCE, WAIT AT LEAST TWO HOURS BEFORE TURNING IT ON.
AFTER INSTALLING THE APPLIANCE, WAIT AT LEAST TWO HOURS BEFORE TURNING IT ON.
6.1 – CONNECTIONS
6.1.1 – ELECTRICAL CONNECTION
Electrical connection must be made by a specialised electrician.
Electrical connection must be made by a specialised electrician.
If it is necessary to unplug the mains supply, first make sure the circuit board is on OFF
If it is necessary to unplug the mains supply, first make sure the circuit board is on OFF
If it is necessary to unplug the mains supply, first make sure the circuit board is on OFF
display.
The manufacture declines all responsibility for damage or accidents caused by failure to observe such
The manufacture declines all responsibility for damage or accidents caused by failure to observe such
The manufacture declines all responsibility for damage or accidents caused by failure to observe such
regulations.
ELECTRICAL CONNECTION PROCEDURE
The appliance is supplied by the manufacturer complete with power plug.
The appliance is supplied by the manufacturer complete with power plug.
The appliance is supplied by the manufacturer complete with power plug.
site; the system must be carried out to current regulations.
site; the system must be carried out to current regulations.
The electricity supply at the installation site must have the following requisites:
Voltage: 230 Vac
Frequency: 50 Hz
6.2 – PRELIMINARY CHECKS
The electrician fitter shall train the operator in the correct use of the blast chiller and give the basic notions of mainten
The electrician fitter shall train the operator in the correct use of the blast chiller and give the basic notions of maintenance.
The electrician fitter shall train the operator in the correct use of the blast chiller and give the basic notions of mainten
METHOD
The operations to prepare the blast chiller for initial start
The operations to prepare the blast chiller for initial start-up must be carried out by a specialised engineer, in the presence of the
operator, who can acquire information to carry out certain routine maintenance and cleaning.
operator, who can acquire information to carry out certain routine maintenance and cleaning.
Before starting up the appliance, a series of checks and inspections must be carried out for the purpose of preventing errors or
accidents during start-up.
Check that the appliance has not been damaged during transport.
Check that the appliance has not been damaged during transport.
Check with special care for any damage to the electrical box,
Check with special care for any damage to the electrical box, push button control panel, wiring and pipes.
Check that all external power sources have been connected properly.
Check that all external power sources have been connected properly.
Check that the machine is perfectly level.
Check that the machine is perfectly level.
6.2.1 – REGULATION
Regulation carried out by unauthorized personnel may damage the appliance and expose the operator to
Regulation carried out by unauthorized personnel may damage the appliance
serious hazards.
serious hazards.
serious hazards.
appliance and as such null the warranty and relieve the manufacturer of any responsibility.
appliance and as such null the warranty and relieve the manufacturer of any responsibility.
appliance and as such null the warranty and relieve the manufacturer of any responsibility.
BCB_03-05-10-15 Rev.02
Check that the power supply voltage given on the ID plate corresponds to that available at the installation
Check that the power
supply voltage given on the ID plate corresponds to that available at the installation
site.
Connections must be made to current regulations; the supply mains must have an efficient earthing system
Connections must be made to current regulations; the supply mains must have an efficient earthing
Connections must be made to current regulations; the supply mains must have an efficient earthing
compliant with electricity regulations in the country; this is a responsibility of the customer.
compliant with electricity regulations in the country; this is a responsibility of the customer.
compliant with electricity regulations in the country; this is a responsibility of the customer.
Do not make tight bends on the power lead and do not place any object whatsoever on top of it.
Do not make tight bends on the power lead and do not place any object whatsoever on top of it.
Do not make tight bends on the power lead and do not place any object whatsoever on top of it.
PROCEDURE
must have the following requisites:
liance, a series of checks and inspections must be carried out for the purpose of preventing errors or
liance, a series of checks and inspections must be carried out for the purpose of preventing errors or
Regulation carried out by unauthorized personnel is considered tampering with the
Regulation carried out by unauthorized personnel is considered tampering with the
Regulation carried out by unauthorized personnel is considered tampering with the
Just connect the power plug to a socket at the installation
Just connect the power plug to a socket at the inst
Just connect the power plug to a socket at the inst
up must be carried out by a specialised engineer, in the presence of the
push button control panel, wiring and pipes.
on the
and expose the operator to
pag. 58

Publicité

Table des Matières
loading

Produits Connexes pour Gemm NEW RUNNER Série

Table des Matières