Putting Into Operation - Boneco S200 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6
PUT TING INTO OPER ATION
en
1
Place the BONECO S200 on a stable surface.
4
Plug the power cord into a power outlet.
2
Place the included anti-mineral pad on the heating
plate.
5
Switch on the BONECO S200 with the output
regulator.
3
Fill the water tank with cold tap water.
6
Select level 1 or level 2 for the steam output.

Publicité

Table des Matières
loading

Table des Matières