13
Fit the horizontals to the top rung of the mounting
EN
14
Hook the horizontals to the top rung of the other mounting frame
15
Push the mounting frame onto the mounting frame
16
Fit the diagonals (as from the 5th rung of the 1st extension frame)
17
Fit the auxiliary platform (3rd rung extension frame)
18
Fit the end guardrails and lock these
19
place the knee and hip guardrails from the inside to the outside
20
Sit in the platform and reposition the horizontal braces (onto the 5th rung of the mounting frame)
21
Reposition the lower platform by fitting it as a working platform to the top rung of the mounting
frame
22
Remove the horizontal braces above the support platform
23
Reposition the support platform on the lowest rung and place (evenly) a total of 40 Kg of ballast
on the platform, 2 x ballast (product no. 415270, 20 kg) or an equivalent alternative24
24
Fit the diagonals
25
Assemble the toe board brackets and toe boards
26
The scaffold is ready for use
1
Disassemble the scaffold in reverse order
2
Use a horizontal shore to unlock the diagonals
Relax. It's an Altrex.
fig. 36
fig. 37
fig. 38
fig. 39
fig. 40
fig. 41
fig. 42
fig. 43
fig. 44
fig. 45
fig. 46
fig. 47
fig. 48
36 of 88