Proto-Aire EZ I/O Manual
5
Installation
Overview
This section is limited to the information needed to setup the Proto-Aire EZ Unit.
Shipping Damage
All equipment should be thoroughly examined for shipping damage before and while unloading.
This equipment has been carefully inspected at our factory, and the carrier has assumed
responsibility for safe arrival. If damaged, either apparent or concealed, the claim must be made
to the carrier.
Apparent Loss or Damage
If there is an obvious loss or damage, it must be noted on the freight bill or receipt and signed
by the carrier's agent; otherwise, carrier may refuse claim. The carrier will supply the necessary
claim forms.
Concealed Loss or Damage
When loss or damage is not apparent until after equipment is uncrated, a claim for concealed
damage is made. Upon discovering damage, make request in writing to carrier for inspection
within 15 days and retain all packing. The carrier will supply inspection report and required
claim forms.
On Site Damage Control
The Proto-Aire EZ Unit is shipped on skids with panels installed. Remove panels to access lifting
points on frame. Do not attempt to move the unit from the skids without first removing the
panels.
3090249_F
P/N