Télécharger Imprimer la page

TECO 320 Manuel D'instructions page 57

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Connect the pneumatic pipe coming from the hydraulic unit to the sleeve unit located on
the pipe that supplies the cylinder lifting the mechanical safeties on the lift.
Connect the hydraulic unit to a pneumatic supply.
To operate the hydraulic unit, and therefore the lift, it is MANDATORY to fit the correct
plug on the supply cable located on the hydraulic unit.
1.
Make sure that the working area is not obstructed;
2.
Make sure that the power supply voltage of the existing main electrical system is
the same as that of the supplied control unit (230V or 400V);
3.
Make sure that voltage arrives to the control unit;
4.
Pour oil in the tank (approx. 5 litres);
5.
Provide power to the lift using the main switch;
6.
Bleed the cylinders keeping the main switch in the up position (pos. 1);
7.
After approx. 5 seconds, release the main switch and then press the down button
until the upper runways return to the floor;
8.
To bleed the system completely, repeat operations 6 and 7 at least 5 times;
EN - Operator's manual
7.7 Pneumatic system connection
Important. for the proper operation of the lift,
fit a pressure regulator for max 10 bar on the pneumatic supply;
the air must also be filtered and lubricated.
7.8 Electrical system connection
it is forbidden to modify the electrical connections pre-set by
the manufacturer or supply the machine with voltage and/or
frequency other than those indicated on the plate.
any damage deriving from failure to follow the instructions given
above cannot be charged to the manufacturer and may cause
the warranty to become null and void.
WarNiNG: PErForm THiS oPEraTioN oNLY aND EXCLU-
SiVELY WiTH THE LiFT WiTHoUT CHarGE.
7.9 Start-up
57

Publicité

loading