Zephyr Tempest II Mode D'emploi page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

" m
2 6
" m
3 6
3 6 "
DUCTING
A minimum of 8" round or 3-1/4" x 10" rectangular
duct for dual internal blower.
Always use rigid type metal ducts only. Flexible
available duct run when using elbows, transitions
and caps.
ALWAYS, when possible, reduce the number or
transitions and turns. If long duct run is required,
increase duct size.
If turns or transitions are required; install as far
away from hood duct output and as far apart,
between the two as possible.
Minimum mount height between range top to hood
bottom should be no less than 26".
Maximum mount height should be no higher than
36".
It is important to install the hood at the proper
mounting height. Hoods mounted too low could
mounted too high will be hard to reach and will
If available, also refer range manufacturer's height
i n .
clearance requirements and recommended hood
a x .
mounting height above range.
Vertical Ducting:
Horizontal Ducting:
DAMAGE-SHIPMENT / INSTALLATION:
• Please fully inspect unit for damage before
installation.
• If the unit is damaged in shipment, return the
unit to the store in which it was bought for
repair or replacement.
• If the unit is damaged by the customer, repair
or replacement is the responsibility of the
customer.
be made by arrangement between customer
and installer.
6
www.zephyronline.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ak7500bsAk7536bsAk7542bsAk7548bsAk7554bsEssentials tempest ii ak7500bs ... Afficher tout

Table des Matières