Zephyr Tempest II Mode D'emploi page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CAUTION: At least two installers are required
due to the weight and size of the hood.
prepare hood. Refer to page 11 for single blower horizontal
ducting, page 13 for dual blower vertical ducting or page 14 for
dual blower horizontal ducting.
line A.
Wood Board Dimensions
AK7500BS - 27" x 1/2" x 4"
AK7536BS - 33" x 1/2" x 4"
AK7542BS - 39" x 1/2" x 4"
AK7548BS - 45" x 1/2" x 4"
AK7554BS - 51" x 1/2" x 4"
6. Prepare duct pipe and duct cut outs in upper cabinet if needed or
page 8 for dimensions.
7. Prepare electrical wiring and electrical cut outs in upper cabinet if
screws.
9. Further secure hood onto wall through lower body screw holes by
10. Install electrical.
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
B
A
3 5/16"
1 11/16"
16 1/8"
13 5/8"
10
www.zephyronline.com
C/L
wood board
C/L
FIG. 1
21 1/4"
27 3/8" (36" & 42"), 35 1/4" (48" & 54")
FIG. 2
4"
16
"
7/8
min
26"
16 7/8"
5 5/16"

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ak7500bsAk7536bsAk7542bsAk7548bsAk7554bsEssentials tempest ii ak7500bs ... Afficher tout

Table des Matières