Belkin OmniView PRO Guide De L'utilisateur page 13

Masquer les pouces Voir aussi pour OmniView PRO:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

P73055/F1D108-OSD/EU/man.qxd
NOTE: Avoid pressing any keys on the keyboard or moving the mouse if the currently
selected port has a computer that is in the process of booting up. This may cause
the computer to not detect, or initialize the keyboard or mouse drivers properly.
Daisy-Chaining the OmniView
The OmniView
the DB25 daisy-chain ports. The F1D108-CBL daisy-chain cable is required (not included) for
proper operation. Please refer to the example below. Here, four OmniView
cascaded together for control over 32 computers. Recall that a maximum of 16 OmniView
PRO units can be cascaded together for control over 128 computers. Recall that the DIP
switches on the MASTER unit must be set to BANK 0, and the slave units set to a unique
BANK (any from 1 through F). See the beginning of this section for more information on the
DIP switch settings.
Cable 1
Cable 2
Cable 3
• After setting the DIP switches on the slave unit, connect the computers using the same
procedure outlined in steps 5 to 9 in the previous section. DO NOT POWER UP THE
COMPUTERS YET.
• Using the F1D108-CBL daisy-chain cable, connect one end to the "Master Input/ Slave
Output" of the unit. Refer to the diagram above.
• If the previous unit is the MASTER, then the other end of the cable connects to
the "Master Input/Slave Output" port of the MASTER (such as cable 1 in the
diagram above).
• If the previous unit is a slave, then the other end goes to the "Slave Input" port of
the previous slave unit (such as cables 2 and 3 in the diagram above).
4/21/00
2:25 PM
Hardware Installation
PRO can be daisy-chained with additional OmniView
Page 9
(continued)
PRO:
9
PRO units through
PRO units are
MASTER
(Bank 0)
slave
(Bank 1)
slave
(Bank 2)
slave
(Bank 3)
En

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

F1d108-osd

Table des Matières