Supplies Required:

Piping to ½" NPT water supply inlet on unit
Pipe sealant
Inlet strainer (recommended)
Sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with
local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from
Bradley Corporation.