Finish Framing; Flush - Napoleon Ascent Série Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10.0 finish framing

finish framing
EN

10.1 flush

WARNING
!
Do not build into this area - it must be left clear to provide adequate clearance for the vent in this 14"
(35.6cm) wide area centered along the front of the appliance. The appliance should be in its final location
before framing.
D
MINIMUM FROM BASE
OF APPLIANCE
B
A
B
C
D
38
W415-1705 / 06.07.17
CEILING
A
36 1/2" (92.7cm)
39 3/8" (100cm)
16 3/8" (41.6cm)
56" (142.2cm)
14"
[35.6cm]
MIN
BL36-1
COMBUSTIBLE
HEADER
DRYWALL
C
BL46
47 1/2" (120.7cm)
39 3/8" (100cm)
18 9/16" (47.1cm)
56" (142.2cm)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ascent bl36-1Ascent bl46

Table des Matières