fi nish framing
10.0 fi nish framing
EN
10.1 fl ush
WARNING
!
•
Do not build into this area - it must be left clear to provide adequate clearance for the vent in this 14"
(35.6cm) wide area centered along the front of the appliance. The appliance should be in its fi nal location
before framing.
H
MINIMUM FROM BASE
OF APPLIANCE
G
B
G
A
H
40
W415-2757 / B / 01.09.20
CEILING
B
36 1/2" (92.7cm)
16" (40.6cm)
14"
[35.6cm]
MIN
BL36-1
39 3/8" (100cm)
56" (142.2cm)
COMBUSTIBLE
HEADER
DRYWALL
A
BL46
47 3/8" (120.3cm)
18 9/16" (47.1cm)