Commissioning; Operation - Schluter Systems LIPROTEC LT EK 24V30W Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 66
EN

Commissioning

7
Commissioning
In order to put a power pack into service, proceed as follows:
Make sure all loads are correctly mounted and
connected as desired.
Switch on the mains power supply.
If you use an on-site light switch (see Chapter 6.1 "Types
of connection"), switch on the power supply using the
connected light switch.
If the light does not work properly, switch it off again and
read more in Chapter 10 "Troubleshooting".
8

Operation

The power pack does not having control or switch elements.
If you have connected the power pack to an on-site light
switch, you can turn it on and off with this.
If you have switched a receiver between the power pack and
LED strip, read the operating instructions of the receiver.
56
Directions for use for the power pack

Publicité

Table des Matières
loading

Table des Matières