3M PROTECTA REBEL Manuel D'instructions page 11

Masquer les pouces Voir aussi pour PROTECTA REBEL:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 47
Serial Number(s):
Model Number:
Inspected By:
Component:
Inspection:
SRL
Inspect for loose bolts and bent or damaged parts.
(Figure 9)
Inspect Housing (A) for distortion, cracks, or other damage.
Inspect the Swivel Eye (B) for distortion, cracks, or other damage. The Swivel Eye should be attached
securely to the SRL, but should pivot freely.
The Lifeline (C) should pull out and retract fully without hesitation or creating a slack line condition.
Ensure device locks up when lifeline is jerked sharply. Lockup should be positive with no slipping.
The labels must be present and fully legible (see Figure 13).
Look for signs of corrosion on the entire unit.
Snap Hook
Inspect the Snap Hook for signs of damage, corrosion, and proper working condition.
(Figure 10)
Lifeline Webbing and Stitching
Inspect webbing; material must be free of cuts (A), frays (B), or broken fibers. Check for tears,
(Figure 11)
abrasions, heavy soiling (C), mold, burns (D), or discoloration. Inspect stitching; Check for pulled or
cut stitches. Broken stitches may be an indication that the harness has been impact loaded and must
be removed from service.
Energy Absorber
Inspect the Energy Absorber to determine if it has been activated. There should be no evidence of
(Figure 12)
elongation and the cover should be secure and free of tears (A) or other damage.
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Table 3 – Inspection & Maintenance Log
11
Date Purchased:
Date of First Use:
Inspection Date:
Before
Each Use
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Competent
Person

Publicité

Table des Matières
loading

Table des Matières