Product Operation - Royal Sovereign RWD-1600B Guide D'utilisation

Distributeur d'eau à chargement par le bas
Masquer les pouces Voir aussi pour RWD-1600B:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PRODUCT OPERATION

BEFORE PLUGGING IN THE UNIT TO A POWER SOURCE:
1. Let the appliance stand upright for about 24 hours. This will reduce the chance of malfunction
in the cooling system from possible mishandling during delivery.
WARNING: The drain cap on the back of the unit may become loose during shipping. Fasten
the drain cap tightly before you start to operate the unit. If the drain cap is loose, the unit may
leak and cause floor damage.
2. Open the lower cabinet door.
3. Place full water bottle on the floor and remove the plastic cover over the mouth of the water
bottle.
4. Place the stainless tube inside the bottle and place the water bottle cap firmly over the mouth
of the water bottle.
5. Attach the hose to the top of the cap, using the quick connect system shown at the bottom of
the page.
6. Slide the bottle inside the cabinet and close the door.
6
Quick Connect System

Publicité

Chapitres

Table des Matières
loading

Table des Matières