Installation; Prior Check; General; Assembling The Control Module - Simco-Ion ThunderION Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Installation

4.1. Prior check

 Check whether the Control Module has been received undamaged.
 Check that the details on the packing slip correspond to the details shown on the product
received.
If you have any problems and/or if in doubt:
Please contact SIMCO (Nederland) B.V. or your regional agent.

4.2. General

Install the Control Module in the desired position within the range of the connection leads of the
ionization equipment.
Fit the Control Module so that the switch on the front is clearly visible and can be easily
reached.
Warning:
 Before working on the equipment, disconnect the power supply.
 Equipment must be earthed to ensure that it works properly and safely.
 Read the ThunderION user manual as well as this user manual.
 Electrical installation, maintenance and repairs may only be carried out by a skilled
electrical fitter.
 Connect only the specified voltages to the control circuits.

4.3. Assembling the Control Module

 Attach the power unit using the fixing holes in the base plate.

4.4. Connection

4.4.1. Connecting the ThunderION(s)

4.4.1.1. With standard cable

Connect one end of the Control Module connecting cable to the Control Module (6-pole round
connector) and connect the other end to the ThunderION (6-pole rectangular connector).
These cables can be delivered by SIMCO (Nederland) B.V., namely:
- 6 m Control Module connecting cable
- 12 m Control Module connecting cable
ControlModuleThunderION_UM_9752160020_NL_D_GB_F_V1_1
Simco item No. 7510014480
Simco item No. 7510014490
24

Publicité

Table des Matières
loading

Table des Matières