EIBENSTOCK EBM 352/3 Notice Originale page 114

Masquer les pouces Voir aussi pour EBM 352/3:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
After each readjustment always check that the screws are tightly
fixed so that safe operating of the drill rig is possible.
Mounting the turnstile
Mount the turnstile (1) on the
right or left side of the
carriage (2) depending on
the work to be performed.
Check whether the turnstile
(1) is fixed tightly.
Fastening of the Drill Rig
Hole centering indicator:
The drill rig is fitted with a hole centering indicator for easy and precise positioning.
Fastening by means of dowels in concrete
To mount the drill stand by means of dowels it is necessary to remove the
vacuum grip and the base gasket from the base plate.
C
B
Use
Mark the center of the hole to be drilled.
Fully extend the hole centering indicator (see fig.).
Position the drill rig in such a way that the tip of the
indicator points precisely to the hole center mark.
After the drill rig has been fastened, put the hole center
indicator back in its original position.
Mark the position of the drill holes for the fastening
on the surface to be drilled.
D
Drill a hole (Ø 15) 50 mm deep (A), into which the
dowel M12 (B) is to be placed; insert and secure the
dowel with the doweling tool (C).
Screw the quick action clamping screw (D) into the
dowel.
A
2
For brickwork, Rawl-Dowels must be used
(drillhole - Ø 20mm).
14
Klick
1

Publicité

Table des Matières
loading

Table des Matières