Les langues disponibles

6.4 Free room

When installing the unit leave enough free room to allow opening,
maintenance in safe conditions.

6.5 Installation

6.6 Fitting the remote panel:

ATTENTION
Check that the unit and its devices have suffered no damages during transport. Pay special
attention to the components secured to the electric panel door and to the refrigerating circuit
pipes. Mount the unit as shown in the drawings; make sure that the
electric connections are carried out properly.
6.7

Safety devices

A) Place the condensing unit on the floor
B) Drill the holes in the ceiling keeping the necessary distance from the wall
C) Please select the matching cable length for sensor cables and power cables between the
evaporating unit and the condensing unit. (The length must be equal to the length of the pre-
charged pipes).
D) Fit a drain line to the condensate water drain connection in the lower part of the
evaporator.
Fix the back plate to the wall using the pre-drilled holes; be careful the panel is kept in a
vertical position.
Fit the connecting cable between panel and unit making sure not to bundle it with other
cables.
mechanical safety devices
The following
1.
Fixed upper and side protections for evaporator and condensing unit, secured by locking
screws.
mm 100
are supplied:
correct use and easy
20