6 Installation
6.1 Plates
The unit is supplied with warning and attention plates as listed in the relevant table.
6.2 Dimensions
See table 1
6.3 Location
6.4 Free room
When installing the unit leave enough free room to allow opening, correct use and easy
maintenance in safe conditions.
6.5 Installation
All LBC except LBCMD151-201
LBCMD151-201
To obtain optimal operation of the unit act as follows:
A) Place the unit in a well ventilated room, far from heat sources.
B) Limit the number of door openings.
C) Make sure that the unit has good air supply and discharge.
D) Fit a drain line to the defrost water drain connection in the lower part of the
condensing unit.
A) Place the condensing unit on the floor
B)
Drill the holes in the ceiling keeping the necessary distance from the wall
C)
Refrigerating connection: to execute this connection, you have to use the pipes
diametrer as suggested in the relative table. Usually the pipe installation is executed
first of all positioning them and then connecting the unions provided.
See table 2
19