Télécharger Imprimer la page

Miele PW 5105 Mode D'emploi page 32

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 10
Produktgruppen 512, 592
32 von 34
Note
Tools required:
Bubble level for stand leveling
Open wrench, 10 mm, for M6 nuts
Torx T-20 screwdriver
Note
This kit, mat. no. 09038900 or 09038870, contains the following:
1 UO 5010 stand for stand kit UO 5010, mat. no. 09038900
1 UG 5010 stand, 1 front panel, 2 side panels, 12 M4 x 12.4 screws for stand kit UG 5010,
mat. no. 09038870
1 foundation kit with packet: 4 brackets / 8 zinc-plated B6.4 washers / 4 M6 x 20 hex screws / 4 M6
hex nuts / 4 S12 studs / 4 8.4 washers / 4 8 x 65 hex wood screws / 20 shims / 8 38mm Ø washers
1 packet containing these instructions and startup card.
List of illustrations:
Fig. 1, Stand height
Fig. 2, Drilling dimensions
Fig. 3, Hole dimensions
Fig. 4, Installing the foundation kit
Fig. 5, UO 5010 stand
Fig. 6, Installing the brackets
Fig. 7, UG 5010 stand
Abbreviation
UM
A-A
B
C
Table 1: Abbreviation List
Close the gas supply, if applicable.
Disconnect the machine from the electrical and gas (if applicable) supplies and secure against erroneous
switch-on.
Mark the drilling dimensions; see Fig. 2.
Note
The machine must be at least 10 millimeters away from the wall.
Drill 4 12-millimeter holes, 65 millimeters deep, in the floor; see Fig. 3.
Insert the 4 S12 studs flush in the holes; see Fig. 4, Pos. 1.
Align the stand using the shims and the level (Fig. 4, Pos. 2).
Secure the stand to the floor using the 4 8 x 65 hex wood screws (Fig. 4, Pos. 3), 8.4 washers
(Fig. 4, Pos. 4) and 38-millimeter washers (Fig. 4, Pos. 5).
Install the machine on the stand.
06.01.2011
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Explanation
Stand
Sectional plane
Foundation kit
Detail view
Umbau- und Montageanweisung
M.-Nr. 09059270

Publicité

loading

Ce manuel est également adapté pour:

Uo 5010Ug 5010