3.2 Residual risks
4.
Installation
5.
Start-up
5.1 Initial start-up
The product has been built in accordance with the latest state of technology and the recognised
technical safety regulations. Nevertheless, risks to persons or damages to the product or other
property can occur during installation and operation.
WARNING
Risks due to failures or faults in electromagnetically sensitive devices! The
electromagnetic radiation of the product can cause faults in sensitive parts
(e.g. in medical equipment). The functionality thereof will be adversely affected.
> Do not place product close to electromagnetically sensitive devices. Pay attention
to the safety instructions of the devices.
> If you have any doubts regarding compatibility, please contact the manufacturer.
The installation instructions are a separate document and are enclosed with the product.
They are exclusively intended for:
•
The operator,
•
The installation and start-up personnel.
WARNING
Life-threatening electric shock during the installation with a plugged in mains plug!
The entire installation process must occur without power!
> Never connect the mains plug to the socket during the installation process.
> Even after completing the installation process, do not connect the mains plug.
The "initial start-up" is thereby immediately started.
> Prior to connecting the mains plug for the first time, first read chapter
"Initial Start-Up" of the operating instructions.
The product is supplied in so-called simple mode for stand-alone operation (SA). These
instructions only describe how to start up in this mode.
Details on the use of the product with software applications can be found in the relevant
software documentation.
Configuration / reading out logs with the MDU
This description is in a separate document „Configuration of the DFT V2 and administration of
the keys with Dialock SERVICE software".
The initial start-up is only possible once after connecting the mains plug to the socket for the
first time. The individual work operations must be carried out within a short time window. Therefore:
•
Study every work operation and have the keys that are needed at the ready before commencing
with initial start-up.
•
Perform the work operations quickly and without interruptions.
For step-by-step instructions „Start-up - Allocating programming and clearing
keys" see illustrations starting on page 42.
13