Toto TBMV Manuel D'installation Et D'utilisation page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION PROCEDURE - VALVE
2.
Pass the valve up through the installation
hole.
Insert the gasket and fasten the collar to
the valve body until it stops.
NOTE: The hot water valve has a red
marking on side of body.
3.
Fixate the valve by threading the
mounting nut up the valve until slightly
Gasket
loose (need adjustability for copper
pipe installation later).
Washer
Do not overtighten!
Mounting
Nut
4.
Repeat steps 1-3 for other valve.
5.
Cut copper tube to size to fit distance be-
tween valve and diverter.
Place the ferrule inside compression nut and
place on each end of copper tube as shown.
Insert ends of copper tube into ports as
shown and fasten nuts to secure.
Repeat with remaining side.
Finish tightening
mount nuts on valves.
Tighten retaining nuts equally
to secure.
Installation of TBMT is now
complete. If installing TBMV,
please continue.
Gasket
Washer
Mounting
Nut
Collar
Mounting
Screws
Gasket
Ferrule
5
Compression
Nut
Copper Tube
Collar
Moun
Scre
Gasket

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tbmt

Table des Matières