Dyson WD04 Instructions D'installation page 10

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 100
Fig. 9
GB
ROI
Secure tap
IN
Feed the hose through the hole in the
JM
plasterboard and into the metal duct.
MT
The rubber seal should now fit between the
tap stem and the wall
Fig.
9a.
PH
SG
Fix the tap to the plasterboard wall, lining
up the mounting holes and making sure that
the tap sits flat on the rubber seal and wall
Fig.
9b.
Attach the tap to the ducting behind the
plasterboard using the 4 x M5 CSK screws
supplied as shown in
Fig. 9b
making sure that
the tap is level before fully tightening.
Screw the cover plate over the tap mounting
plate and tighten to hand tight
Fig.
A= Rubber seal
B= Grey hose
C= Tap stem
D= Cover plate
Fig. 10
Connecting the tap
Clip the grey hose into the backplate.
Plug the sensor cable in the hose into
the connector in the backplate as shown
in
Fig.
10. Check the orientation of the
connector; the two tabs must be lined
up. Ensure the cable is correctly routed in
the backplate.
10
Fig. 11
Connecting the water tube
Cut the water tube to size at the dotted white
line as shown in
Fig.
11a.
Slide the hose clip
(supplied)
onto the water
tube
Fig.
11b.
Remove the
2
x Phillips screws and unclip the
solenoid from the backplate
Fig.
Attach the water hose to the solenoid
Clip the solenoid back on to the backplate
and fasten the
2
x screws
Fig.
Tighten the hose clip and ensure the
solenoid cable is correctly positioned in the
9c.
retaining channel.
Fig. 12
Connecting the electricity supply
Route the electricity supply to the backplate
using approved flexible or solid conduit
and fittings. Ensure the power cable is long
enough to connect to the terminal block
mounted in the back plate.
Route the cable into the backplate and tighten
the cable gland.
Strip the cable to a suitable length and
secure the live and neutral wires into the
corresponding terminal blocks as shown in
Fig.
12. Ensure the correct positioning of the
cables before proceeding.
WWW.RESTROOMDIRECT.COM
Fig. 13
Re-assemble electrical cover
Fix the electrics cover and secure with
the 6 x fixings supplied ensuring no wires
are trapped.
Fig. 14
11b.
Connecting the mixed water supply
NOTE: Ensure water feed has been
Fig.
11c.
completely flushed of debris, copper
filings etc. prior to connecting to the
backplate. Failure to do so may damage the
11d.
solenoid valve.
Connect the isolated, mixed water supply to
the backplate.
Turn on the water.
Inspect for leaks at the main water supply inlet
and the water tube connection to the tap.
Also check for leaks at the
solenoid connection.
704 • 937• 2673
129 Oakpark Dr., Unit A, Mooresville, NC 28115
Fig. 15
Switching power on
Switch on power to the machine.
CALIBRATION CYCLE: Once installed, the tap
will go through a 30 second calibration cycle.
Place hand under sensor on tap to activate
water flow.
Check for leaks as per
Fig.
14.
Secure the water pipe cover on to the
backplate using the
2
x fixings provided.
Fig. 16
Assembling the motor bucket
Hook the motor to the top of the electrics
cover. Swing it downwards so it clicks into
place as shown. Push in securely.
OPTIONAL: A screw is supplied to secure the
red release button and prevent unwanted
removal of the motor bucket.
Test the unit for correct operation.
Fig. 17
Fitting the access panel
Fix the access panel to the plasterboard using
the 4 x M6 screws.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Wd06Wd05

Table des Matières