E
Commissioning
Thoroughly flush the supply line before
commissioning the pressure reducer.
Observe the operating and maintenance
instructions (I. No. 35 07 390 85) when
commissioning the pressure reducer.
Re-setting the pressure reducer
Changing the factory settings is the
performer's sole responsibility. Please refer
to the operating and maintenance instructions
(I. No. 35 07 390 85) when re-setting the pres-
sure reducer.
Please refer to the operating and
maintenance instructions
(I. No. 35 07 390 85) when maintaining
the valve.
40