Secondary Bag - Safran MULTI MISSION SYSTEM 420 Manuel D'utilisation Et D'entretien

Table des Matières

Publicité

PARACHUTE & PROTECTION
POD secondaire
Installer les élastiques sur les pontets du POD.
(Fig.509 et 510)
4 à 5 Tubes stoes naturels
4 to 5 naturals tubes stoes
Passer la grande drisse de temporisation au
travers de l'œillet du POD secondaire.
(Fig.511)
CE DOCUMENT EST LA PROPRIETE DE LA SOCIETE SAFRAN ELECTRONICS AND DEFENSE IL NE PEUT ETRE NI REPRODUIT NI COMMUNIQUE SANS L'AUTORISATION DE
THIS DOCUMENT IS SAFRAN ELECTRONICS AND DEFENSE PROPRIETY.IT CANNOT BE REPRODUCED NOR COMMUNICATED WITHOUT ITS WRITTEN AUTHORIZATION.
CMM 25-63-99
MANUEL D'UTILISATION ET D'ENTRETIEN SMM 420 TYPE 740-2
CMM 25-63-99
COMPONENTS MAINTAIN AND USER MANUAL MMS 420 TYPE 740-2
Fig. 509
SAFRAN ELECTRONICS AND DEFENSE

Secondary bag

Put naturals tube stoes on the outside secondary
deployment bag locations.(Fig.509 and 510)
Fig. 510
Route the longest reefing bridle through the
secondary deployment bag grommet.(Fig.511)
Fig. 511
233
ED 15
11/2020
ED 15
11/2020

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

740-2

Table des Matières