PARACHUTE & PROTECTION
Passer le tube stoe bas droit du conteneur
principal à travers le pontet bleu bas droit de la
pochette Kit C et verrouiller en effectuant un
lovage avec la SOA.(Fig.485 et 485)
Continuer le lovage avec la SOA sur le bas de
la pochette kit C.(Fig.487)
CE DOCUMENT EST LA PROPRIETE DE LA SOCIETE SAFRAN ELECTRONICS AND DEFENSE IL NE PEUT ETRE NI REPRODUIT NI COMMUNIQUE SANS L'AUTORISATION DE
THIS DOCUMENT IS SAFRAN ELECTRONICS AND DEFENSE PROPRIETY.IT CANNOT BE REPRODUCED NOR COMMUNICATED WITHOUT ITS WRITTEN AUTHORIZATION.
CMM 25-63-99
MANUEL D'UTILISATION ET D'ENTRETIEN SMM 420 TYPE 740-2
CMM 25-63-99
COMPONENTS MAINTAIN AND USER MANUAL MMS 420 TYPE 740-2
SAFRAN ELECTRONICS AND DEFENSE
Over the stowed drogue bridle, pull and thread
the lower right hand side tube stow through the
lower right hand side blue becket of drogue
pocket Kit C, secure with a bight of static line.
(Fig.485 and 486)
Fig. 485
Fig. 486
Contonue the bight of static line at the lower part
of the drogue pocket kit C.(Fig.487)
Fig. 487
225
ED 15
11/2020
ED 15
11/2020