Tylo STELLA 2900 3005 Guide D'installation/Mode D'emploi page 25

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 55
2.
Fig. 3 Water connection
1. Optional overhead shower G1/2" (projection from wall 10-45 mm)
2. Cold and hot water G1/2" (projection from wall 10-45 mm)
3. Shut-off valve
1.
G1/2"
Max 45 mm
Min 10 mm
3.
IMPORTANT!
Before the incoming water supply is
connected to the steam generator, the piping system must be
flushed through. Flushing prevents metal particles and other
impurities entering the steam generator system from the piping.
IMPORTANT!
The incoming water pressure must be
between 1 and 5 bar (min 100kPa and max 500kPa).
It is an advantage to install a shut-off valve in the water supply
line to facilitate repairs/servicing.
3.
1.
CC Max 80 mm
Fig. 4 Pipe connections
1. Cold water
2. Hot water
3. For overhead shower (if applicable)
4. Area for electrical wiring
min 300 mm
4.
2.
120 mm
23

Publicité

Table des Matières
loading

Table des Matières