Starting the device
Prior to commissioning, check the power supply cord (1), the plug, and the extension cable
for electrical and mechanical damage.
Switch off the MINIFLOOR (6) and hot air hand tool (22) main switches.
The nominal voltage, specifi ed on the devices must match the mains voltage. Connect the device to
the nominal voltage.
In the event of power failure , swivel the hot air hand tool (22) into the parking position.
Do not point the hot air flow at people or animals.
Place the MINIFLOOR on the floor to be wel-
ded and swivel the hot air hand tool (22)
into the parking position. Unlock guide arm
lock (19).
Place the guide wheel (3) in the groove for
the welding rod. Switch the MINIFLOOR on
via the main switch (6).
Switch the hot air hand tool (22) on using the
appropriate switch.
Adjust the welding parameters for the hea-
ting, and – if available – the blowers.
For the hot air hand tool settings, please ob-
serve the operating instructions of the device
in use.
Welding Sequence
Preparation
Carry out test welds according to the welding instructions from the material manufacturer and the
national standards or directives. Check the test weld.
• Adjust the welding speed, heating, and blowers.
• It is important to reach the welding temperature (heating time approx. 3–5 min).
Risk of entanglement! Fingers, hair, or items of clothing can be drawn in.
Start of the welding process
• Insert the welding rod into the rapid
welding nozzle (24).
• Swivel the hot air hand tool (22) down-
wards, the drive motor starts automati-
cally.
• Ensure that the guide wheel (3) remains
in the groove.
20
6
With unwinding device
24
22
1
19
3
22
3