Chapter 5. Machine Installation; Transport And Positioning; Environmental Conditions - Minipack-Torre Tunnel 50 Digit Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 38

Chapter 5. Machine installation

5.1. Transport and positioning

 Handle with great care during transport and positioning!
 Before any movement, make sure that the lifting means is suitable for the load to be lifted!
Cut the strap with scissors make sure you protect
your eyes by wearing glasses and withdraw the
cardboard.
Remove the roller plate (19).
Unscrew the 4 fastening screws (A) to the pallet,
putting the 4 plates (B) back inside the machine.
Using a fork lift, remove the tunnel from its pallet and
level it on the ground.
Position the roller plate (19), coupling it to the
conveyor belt.

5.2. Environmental conditions

Place the machine level on the floor in a suitable environment free from humidity, gases, explosives, combustible
materials. The machine may only be installed on smooth, flat non-inflammable surfaces.
Leave a minimum space of 0,5m around the machine so that not to obstruct air inlets.
Once the correct position is achieved, lock the machine by means of the wheel brakes.
Working environment conditions:
Temperature from + 5°C to + 40°C
Relative humidity from 30% to 90%, without condensation
The lighting of the operation room shall comply with the laws in force in the country where the machine is installed.
However, it shall be uniform and allow good visibility in order to safeguard the operator's safety and health.
MACHINE PROTECTION FACTOR = IP20
THE AIRBORNE NOISE MADE BY THE MACHINE IS LOWER THAN 70 dB(A)
18
EN

Publicité

Table des Matières
loading

Table des Matières